Amidst over a thousand large wooden crates, several 40-ton behemoths presented a thorny challenge.
The greatest hurdle for these super-heavy machines lay in hoisting operations—poor lift point design or imprecise maneuvering risked tipping, even casualties.

NCL. faced a demanding test of mechanics and engineering.
The team first 3D scanned each machine, precisely calculating its center of gravity and designing custom lift points.
Every cable stress and hoisting angle had to be exact, down to the millimeter.
Yet challenges mounted: port crane load limits, transport vehicle axle load distribution, and bridge clearance along the route. The slightest misstep could derail the plan.

Crucially, engineers drafted countless sketches, built reinforced brackets and stabilizers, and even simulated sway in sea conditions.
On loading day, the site fell silent. As the crane hoisted the beast and it landed firmly on deck, relief swept through the crew.